( Investigating delay factors in construction industry: A Korean perspective ) |
| ;;; ºÎ°æ´ëÇб³ ´ëÇпø Åä¸ñ°øÇаú;ºÎ°æ´ëÇб³ ´ëÇпø °Ç¼³°ü¸®°øÇÐÇùµ¿°úÁ¤;ºÎ°æ´ëÇб³ °Ç¼³°øÇкÎ;
|
|
|
 |
|
| |
| ÃÊ ·Ï |
|
|
| Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors. |
| |
| Ű¿öµå |
| Construction projects;delay factors;Project participants;Project matter.; |
| |
|
|
 |
|
Çѱ¹°Ç¼³°ü¸®ÇÐȸ³í¹®Áý / v.7, no.5, 2006³â, pp.177-190
Çѱ¹°Ç¼³°ü¸®ÇÐȸ
ISSN : 2005-6095
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200634515086352)
¾ð¾î : ¿µ¾î |
|
| ³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø |
|
|
|
|
|
|