¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹Áö¹Ý°øÇÐȸ / v.11, no.4, 1995³â, pp.125-140
¹è¼öÇü Åͳγ» °ú´ÙÀ¯ÀÔ¼ö°¡ ÅͳÎÀÇ ¾ÈÁ¤¿¡ ¹ÌÄ¡´Â ¿µÇâ
( A Study on the Groundwater Effects in the Design of Tunilel Lining )
õº´½Ä;ÃÖ¼Û¾Ï;³²¼ø¼º; ÇѾç´ëÇб³ °ø°ú´ëÇÐ Åä¸ñ°øÇаú;°ø¿µÅä°Ç (ÁÖ), ÇѾç´ëÇб³ ´ëÇпø;;
 
ÃÊ ·Ï
¹è¼öÇüÅͳÎÀÇ ¼³°è°³³äÀº ¹è¼ö½Ã ¼³ºñ Á¤»óÀûÀ¸·Î °¡µ¿µÈ´Ù´Â °¡Á¤ÇÏ¿¡¼­ ÅͳΠ¶óÀ̴׿¡ ÀÛ¿ëÇÏ´Â ¼ö¾ÐÀÇ ¿µÇâÀ» °í·ÁÇÏÁö ¾Ê´Â °ÍÀÌ ÀϹÝÀûÀÌ´Ù. ±×·¯³ª ÀÌ¿Í °°Àº ¼³°è°³³äÀº ÁöÇϼöÀ§°¡ ÅͳΠÇϴܺΠ¾Æ·¡·Î ÀúÇϵǴ °æ¿ì¿¡´Â ÇÕ´çÇÏÁö¸¸, ÁöÇϼöÀÇ °ø±Þ¿øÀÌ ÃæºÐÇÏ¿© ÁöÇϼöÀ§ ÀúÇϰ¡ Å©Áö ¾ÊÀº Á¤»ó·ù »óÅÂÀÎ ÇÏõ ÀÎÁ¢±¸°£ µî¿¡¼­´Â ħÅõ·ÂÀÌ ¶óÀ̴׿¡ ÀÛ¿ëÇÒ ¼ö ÀÖÀ¸¹Ç·Î ÀÌ °æ¿ì ¼ö¾ÐÀ» °í·ÁÇÏÁö ¾ÊÀ¸¸é ÅͳΠ¾ÈÁ¤¿¡ ¹®Á¦°¡ ¹ß»ýÇÒ ¼ö ÀÖ´Ù. µû¶ó¼­ º» ¿¬±¸¿¡¼­´Â ÁÖº¯ ÁöÇϼöÀ§ ÀúÇϰ¡ °ÅÀÇ ¾ø´Â ¼­¿ïÁöÇÏö $igcirc$È£¼±Áß 4°³ °ø±¸Áß ´ëÇ¥ ´Ü¸é 2°³¿¡ ´ëÇØ ¹è¼öÇüÅͳΠ³»ºÎÀÇ °ú´ÙÀ¯ÀÔ¼ö°¡ ÅͳΠ¾ÈÁ¤¼º¿¡ ¹ÌÄ¡´Â ¿µÇâÀ» °ËÅäÇϱâ À§ÇÏ¿© ħÅõ·ù ÇØ¼® ¹× ¶óÀÌ´× °ËÅ並 À¯ÇÑ¿ä¼Ò¹ýÀ» ÀÌ¿ëÇÏ¿© °ËÅäÇÏ¿´´Ù. ±× °á°ú ÅͳÎÀÇ ¶óÀ̴׿¡ ´ëÇÑ ¼ö¾ÐÀÌ ´çÃÊ ¼³°è¿¡ ºñÇØ ´Ù¼Ò Å©°Ô ³ªÅ¸³µÀ¸¸ç Åͳα¸Á¶¹°ÀÇ Àå±âÀûÀÎ ¾ÈÀüÀ» À§ÇÏ¿©´Â Â÷¼ö°øÀÇ ¼³Ä¡ ¶Ç´Â ¿µ±¸°èÃø µîÀÇ ´ëÃ¥ÀÌ ÇÊ¿äÇÒ °ÍÀ¸·Î ÆÇ´ÜµÇ¾ú´Ù.
Generally, the groundwater pressure is not considered in the design of concrete lining of bottom drainage tunnel. This design method implies that the phreatic surface is drawdown to the bottom of tullnel. When tile groundwater is continually supplied without changing of groundwater table, there is a possibility at which the groundwater pressure acting on the tunnel lining after the completion of tunnel. Therefore, the safety of tunnel lining must be checked in this case. In this paper, the stability of bottom drainage tunnel which is affected by groundwater discharge is analzed by using of the Finite Element Method at the 2 sections of subway where the groundwater level has a tittle change during the construction. As the result of analysis, the grouting for the water tightness and the permanent monitoring system of tunnel are required for maintaining of long-term stability of bottom drainage tunnel for the case of groundwater plassure acting on the tunnel lining is greater than that of design stage.
 
Ű¿öµå
 
Çѱ¹Áö¹Ý°øÇÐȸÁö:Áö¹Ý / v.11, no.4, 1995³â, pp.125-140
Çѱ¹Áö¹Ý°øÇÐȸ
ISSN : 1229-215X
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO199511920446297)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿