Çѱ¹Áö¹Ý°øÇÐȸ / v.24, no.7, 2008³â, pp.61-73
|
ÇöÀ埼³¸»¶ÒÀ» Àû¿ëÇÑ ´ÙÁÖ½Ä ±âÃÊ¿¡¼ ¸»¶Ò°ú ĸÀÇ °°áÇÕ¿¡ ´ëÇÑ ºÐ¼®
( Analysis on the Rigid Connections of the Drilled Shaft with the Cap for Multiple Pile Foundations ) |
| Á¶¼º¹Î; Çѱ¹µµ·Î°ø»ç ÀÎõ´ë±³°Ç¼³»ç¾÷´Ü ±â¼úÁö¿øÆÀ;
|
|
|
 |
|
| |
| ÃÊ ·Ï |
| ´Ù¼öÀÇ ¸»¶ÒÀ» ĸ(È®´ë±âÃÊ)À¸·Î ¿¬°áÇÏ¿© ÇÏÁßÀ» ÁöÁöÇÏ´Â ´ÙÁÖ½Ä ±âÃÊ¿¡ ´ëÇÏ¿© ĸÀÇ ¿¬°áºÎ¸¦ °°áÇÕ Á¶°Ç°ú ÈùÁö°áÇÕ Á¶°ÇÀ¸·Î ±¸ºÐÇÏ¿© ¸»¶Ò ¹Ý·Â ÇØ¼®ÀÇ ÇÕ¸®¼ºÀ» ºÐ¼®ÇÏ¿´À¸¸ç, ³Î¸® »ç¿ë ÁßÀΠź¼ºº¯À§¹ý°ú ¶ó¸à½Ä ÇÁ·¹ÀÓ ÇØ¼®¿¡ ±â¹ÝÇÑ ºñ¼±Çü ÇØ¼®±â¹ýÀ» ºñ±³ÇÏ¿© °ËÅäÇÏ¿´´Ù. ƯÈ÷ ½ÇÁ¦ ÇØ»ó Àå´ë±³·®ÀÇ Á¶°ÇÀ» ´ë»óÀ¸·Î »óºÎ±¸Á¶¿Í ±âÃʸ¦ ¿¬°èÇÑ Àüü ±¸Á¶°è ÇØ¼® °á°ú¸¦ ºÐ¼®ÇÏ¿© ¸»¶Ò¸Ó¸® ±¸¼Ó Á¶°Ç¿¡ ´ëÇÑ ±âÃÊ ºÎÀç ´Ü¸é·Â »êÁ¤ÀÇ ÀûÁ¤¼ºÀ» ÆÄ¾ÇÇÏ¿´´Ù. À̸¦ À§ÇØ Ä¸°ú ¿¬°áµÈ °¢ ¸»¶Ò¿¡¼ ¹ß»ýÇÏ´Â ÈÚ¸ð¸àÆ®, Àü´Ü·Â, ¾ÐÃà·Â µî ¹Ý·ÂÀ» »êÁ¤Çϰí PM»ó°üµµ ºÐ¼®°ú ÁöÁö·Â »êÁ¤À» ÅëÇØ ¸»¶Ò ºÎÀçÀÇ ¾ÈÁ¤¼ºÀ» °ËÅäÇÏ¿´´Ù. ÀϹÝÀûÀÎ ±Ô¸ðÀÇ ±³·®, ¶Ç´Â °¼ºÀÌ Å©Áö ¾ÊÀº ¸»¶ÒÀ» Àû¿ëÇÑ ±âÃÊ¿¡¼´Â ¸»¶Ò-ĸ °áÇÕ Á¶°Ç¿¡ µû¸¥ ¸»¶Ò ´Ü¸é ¼³°èÀÇ Â÷À̰¡ ÇöÀúÇÏÁö ¾ÊÀ¸³ª, ¸»¶ÒÀÌ Áö¸é À§·Î ÀÏÁ¤ ±æÀÌ ÀÌ»ó µ¹ÃâµÇ´Â ´ÙÁÖ½Ä ±âÃÊÀÇ ÇØ»ó±³·®¿¡¼´Â ¸»¶Ò¸Ó¸®¸¦ ÈùÁö·Î °í·ÁÇÒ °æ¿ì ÁöÁߺο¡¼ ¸Å¿ì Å« ÈÚ¸ð¸àÆ®¿Í Àü´Ü·ÂÀÌ À¯¹ßµÇ¸ç, ¸»¶Ò¸Ó¸®ÀÇ ¼öÆòº¯À§·®ÀÌ ±Ø´ÜÀûÀ¸·Î Áõ°¡ÇÏ¿´´Ù. ÇØ»ó Àå´ë±³·®¿¡ ´ëÇØ¼´Â ºñÇö½ÇÀû °¡Á¤Á¶°Ç¿¡ ±â¹ÝÇÑ Åº¼ºº¯À§¹ý º¸´Ù´Â ¸»¶Ò¸Ó¸®¸¦ ĸ¿¡ °°áÇÕÇÏ°í ¸»¶ÒÀÌ Åº¼ºÆÇ¿¡ ÁöÁöµÈ º¸·Î °£ÁÖÇÏ´Â ¶ó¸à(rahmen) ¸ðµ¨¸µÀ» ÅëÇØ »óºÎ±¸Á¶¿Í ¿¬°èÇÑ Àüü ±¸Á¶°è ÇØ¼®À» ¼öÇàÇÏ´Â °ÍÀÌ ¹Ù¶÷Á÷ÇÏ´Ù. |
|
| Piles of a bridge pier are connected with the column through the pile cap (footing). Behavior of the pile foundation can be different according to the connection method between piles and the pile cap. Connection methods between pile heads and the pile cap are divided into two groups : rigid connections and hinge connections. Domestic design code has been specified to use rigid connection method for the highway bridge. In the rigid connection method, maximum bending moment of a pile occurs at the pile head and this helps the pile to prevent the excessive displacement. Rigid methods are also good to improve the seismic performance. However, some specifications prescribe that conservative results through investigations of both the fixed-head condition and the free-head condition should be reflected in the design. This statement may induce an over-estimated design for the bridge which has high-quality structures with casing covered drilled shafts and the PC-house contained pile cap. Because the assumption of free-head conditions (hinge connections) is unreal for the elevated pile cap system with multiple piles of the long span sea-crossing bridges. On the other hand, elastic displacement method to evaluate the pile reactions under the pile cap is not suitable for this type of bridges due to impractical assumptions. So, full modeling techniques which analyze the superstructure and the substructure simultaneously should be performed. Loads and stress state of the large diameter drilled shaft and the pile cap for Incheon Bridge which will be the longest bridge of Korea were investigated through the full modeling for rigid connection conditions. |
| |
| Ű¿öµå |
| drilled shaft;pile cap;footing;rigid connection;bridge; |
| |
|
|
 |
|
Çѱ¹Áö¹Ý°øÇÐȸ³í¹®Áý / v.24, no.7, 2008³â, pp.61-73
Çѱ¹Áö¹Ý°øÇÐȸ
ISSN : 1229-2427
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200834347672410)
¾ð¾î : Çѱ¹¾î |
|
| ³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø |
|
|
|
|
|
|