¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹Áö¹Ý°øÇÐȸ / v.21, no.10, 2005³â, pp.73-83
¼öÄ¡ÇØ¼®À» ÅëÇÑ ÄÜÅ©¸®Æ®±Ëµµ ħÇϰ¨¼Ò ¸ñÀûÀÇ ¸»¶Ò±âÃÊ ¼³Ä¡È¿°ú Æò°¡
( Numerical Evaluation of Pile Installation Effects as Settlement Reducers for Concrete Tracks )
À̼öÇü; Çѱ¹Ã¶µµ±â¼ú¿¬±¸¿ø;
 
ÃÊ ·Ï
ÃÖ±Ù »ç¿ëÀÌ Áõ´ëµÇ°í ÀÖ´Â ¸»¶ÒÁöÁö Àü¸é±âÃÊ(piled raft foundation) °³³äÀÇ ±âÃÊ ¼³°è¿¡¼­´Â ÁöÁö·ÂÀ» Áõ´ë½Ã۱â À§ÇÑ ¸ñÀû º¸´Ù´Â ÁַΠħÇϸ¦ °¨¼Ò½Ãų ¸ñÀûÀ¸·Î ¸»¶ÒÀÌ »ç¿ëµÈ´Ù. ÄÜÅ©¸®Æ®±Ëµµ°¡ ¿¬¾àÇÑ Áö¹Ý¿¡ ¼³Ä¡µÇ´Â °æ¿ì¿¡´Â ÀϹÝÀûÀ¸·Î ÁöÁö·Â Ãø¸é¿¡¼­ÀÇ ¹®Á¦´Â ¾øÀ¸³ª, °úµµÇÑ Ä§Çϰ¡ ¹ß»ýÇÒ ¼ö ÀÖ´Ù. ÀÌ °æ¿ì ¼Ò¼öÀÇ ¼Ò±¸°æ ¸»¶ÒÀ» ±ËµµÇϺο¡ ÀûÀýÈ÷ ¹èÄ¡ÇÏ¿© ¼³Ä¡Çϸé ħÇϸ¦ È¿°úÀûÀ¸·Î °¨¼Ò½Ãų ¼ö ÀÖÀ» °ÍÀ¸·Î ¿¹ÃøµÈ´Ù. º» ³í¹®¿¡¼­´Â ¸»¶Ò ¼³Ä¡·Î ÀÎÇÑ ÄÜÅ©¸®Æ®±ËµµÀÇ Ä§Çϰ¨¼Ò È¿°ú¸¦ ¼öÄ¡ÇØ¼®À» ÅëÇØ Æò°¡ÇÏ¿´´Ù. 3Â÷¿ø À¯ÇÑÂ÷ºÐÇØ¼®¹ýÀ» ÀÌ¿ëÇÏ¿© ¸»¶ÒÀÌ ¼³Ä¡µÈ ÄÜÅ©¸®Æ®±Ëµµ¸¦ ¸ðµ¨¸µ ÇÏ¿´À¸¸ç, Áö¹Ý °­¼º°ú ¸»¶Ò ¹èÄ¡ÀÇ º¯È­¿¡ µû¸¥ ħÇÏ·® °¨¼Ò È¿°úÀÇ Â÷À̸¦ ºÐ¼®ÇÏ¿´´Ù. ÇØ¼® °á°ú·Î ºÎÅÍ ¸»¶Ò¼³Ä¡¸¦ ÅëÇØ ÄÜÅ©¸®Æ®±ËµµÀÇ Ä§Çϸ¦ È¿°úÀûÀ¸·Î °¨¼Ò½Ãų ¼ö ÀÖ´Â °ÍÀ» È®ÀÎÇÏ¿´À¸¸ç, °æÁ¦ÀûÀÎ ¼³°è¸¦ À§ÇÑ Áö¹ÝÁ¶°Ç¿¡ µû¸¥ ÇÕ¸®ÀûÀÎ ¸»¶Ò ¿­¼ö¿Í °£°ÝÀ» Á¦½ÃÇÏ¿´´Ù. ¶ÇÇÑ, Áö¹Ý Á¶°Ç°ú ¸»¶Ò ¹èÄ¡ÀÇ º¯È­¿¡ µû¸¥ ¸»¶ÒÀÇ ÇÏÁßºÐ´ã Æ¯¼ºÀ» ºÐ¼®ÇÔÀ¸·Î½á, ÄÜÅ©¸®Æ®±Ëµµ ÇϺο¡ ¼³Ä¡µÈ ¸»¶ÒÀÇ ÁöÁö ¸ÞÄ¿´ÏÁòÀ» ÆÄ¾ÇÇÏ¿´´Ù.
Recently, foundation designs based on piled raft concept have been increasing, where the piles are required not to ensure the overall stability of the foundation but to act as settlement reducer. When a concrete track is constructed on soft ground, excessive settlements may occur, while it rarely has bearing capacity problems. In this case, the settlement of the concrete track may be effectively reduced by arranging a small number of small-diameter piles beneath the track. This paper presents the effect of pile installation on the reduction of concrete track's settlement. A 3D finite difference method was employed to model the piled concrete tracks. A parametric study was carried out to assess the effect of varying soil condition and pile arrangements. From the analysis results, it is verified that the effect of the pile installation is significant to effectively reduce the settlement of concrete track. Optimal number of pile rows and pile spacings was proposed for the economical design of a piled concrete track. The bearing mechanism of piles was also investigated by analyzing load sharing characteristics of pile according to soil conditions and pile arrangements.
 
Ű¿öµå
Concrete track;Pile;Pile arrangement;Piled raft;Settlement;
 
Çѱ¹Áö¹Ý°øÇÐȸ³í¹®Áý / v.21, no.10, 2005³â, pp.73-83
Çѱ¹Áö¹Ý°øÇÐȸ
ISSN : 1229-2427
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200509408734853)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿