¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹°ÇÃà½Ã°øÇÐȸ / v.9, no.4, 2009³â, pp.55-61
ÀÀ°á½Ã°£Á¶Á¤¿¡ ÀÇÇÑ ¸ÅÆ®±âÃÊ ¸Å½º ÄÜÅ©¸®Æ®ÀÇ ¿Âµµ±Õ¿­Àú°¨ °ø¹ýÀû¿ëÀÇ Mock-up Test
( Mock-up Test of Temperature Crack Reduction Method Application by Setting Time Control of Mat Foundation Mass Concrete )
ÇÑõ±¸;ÀÌÀç»ï;³ë»ó±Õ; ûÁÖ´ëÇб³ °ÇÃà°øÇаú;ûÁÖ´ëÇб³ ´ëÇпø;ûÁÖ´ëÇб³ »ê¾÷°úÇבּ¸¼Ò;
 
ÃÊ ·Ï
ÇöÀç ±¹³»ÀÇ °Ç¼³°ø»çÇöÀå¿¡¼­´Â µµ½ÉºÎ¿¡ ´ëÇü °Ç¼³»ç¸¦ Áß½ÉÀ¸·Î ÃʰíÃþ °ÇÃ๰ÀÇ ½Ã°øÀÌ ÁøÇà Áß¿¡ ÀÖ´Ù. ±×·±µ¥ ÀÌ·¯ÇÑ ÃʰíÃþ °ÇÃ๰ÀÇ ±âÃÊ´Â »óºÎÀÇ Å« ÇÏÁßÀ» ÁöÁöÇϱâ À§ÇØ ¸Å¿ì µÎ²¨¿î ¸ÅÆ® ÄÜÅ©¸®Æ®°¡ ÇʼöÀûÀÌ´Ù. ±×·¯³ª ÀÌ¿Í °°Àº ¸Å½º ÄÜÅ©¸®Æ®´Â ÇöÀå¿©°Ç»ó ´Ù·®ÀÇ ÄÜÅ©¸®Æ®¸¦ µ¿½Ã¿¡ Ÿ¼³ÇÒ ¼ö ¾ø±â ¶§¹®¿¡ ÀÏü¼º¿¡ Àǹ®ÀÌ Á¦±âµÇ´Â °ÍÀº ¹°·ÐÀÌ°í ¼öÈ­¹ß¿­½Ã°£ÀÇ ¼­·Î ´Ù¸§¿¡ µû¸¥ ³»ÀÀ·Â¿¡ ÀÇÇÑ ±Õ¿­¹ß»ý °¡´É¼ºÀÌ Áõ°¡ÇÑ´Ù. µû¶ó¼­ º» ¿¬±¸¿¡¼­´Â »ó±âÀÇ ¹®Á¦Á¡À» ÇØ¼Ò½Ã۰íÀÚ ±¹³» ¸ðó¿¡ °Ç¼³µÇ°í ÀÖ´Â ÃʰíÃþ °ÇÃ๰À» ´ë»óÀ¸·Î ÃÊÁö¿¬Á¦ÀÇ ÀÀ°á½Ã°£Â÷¸¦ Ȱ¿ëÇÑ ¼öÆòºÐÇÒŸ¼³ °ÇÃà ¸Å½º ÄÜÅ©¸®Æ®ÀÇ ¼öÈ­¿­ Á¶Á¤°ø¹ýÀ» ½ÇÁ¦ °ÇÃàÇöÀå¿¡ Àû¿ëÇϰíÀÚ Mock-up test¸¦ ÅëÇÏ¿© ±× È¿À²¼ºÀ» È®ÀÎÇÏ¿´´Ù. ½ÇÇè°á°ú ÃÊÁö¿¬Á¦ ÅõÀÔ Àü ÈĽ½·³ÇÁ Ç÷οì´Â ¸ñÇ¥ Áö¿¬½Ã°£ÀÌ ±æ¾îÁú¼ö·Ï ´Ù¼Ò Áõ°¡ÇÏ¿´°í, °ø±â·®Àº Å« Â÷ÀÌ´Â ¾ø´Â °ÍÀ¸·Î ³ªÅ¸³µÀ¸¸ç, ÀÀ°á½Ã°£Àº ¸ñÇ¥ Áö¿¬½Ã°£ÀÌ ±æ¾îÁú¼ö·Ï Áö¿¬µÇ¾ú´Ù. ¸ñÇ¥ Áö¿¬½Ã°£ÀÌ ±æ¾îÁú¼ö·Ï ÃʱâÀç·É¿¡¼­´Â ¾ÐÃà°­µµ°¡ ÀÛ°Ô ³ªÅ¸³µÀ¸³ª, Àç·ÉÀÌ °æ°úÇÒ¼ö·Ï °­µµÁõÁø ÆøÀÌ Å©°Ô µÇ¾î Àç·É 28ÀÏ¿¡¼­´Â º¸Åë ÄÜÅ©¸®Æ®º¸´Ù µ¿µî ȤÀº ±× ÀÌ»óÀ» ³ªÅ¸³»¾ú´Ù. ¶ÇÇÑ 2´Ü ¹× 4´ÜÀ¸·Î ÃÊÁö¿¬Á¦¿¡ ÀÇÇÑ ÀÀ°á½Ã°£Â÷°ø¹ýÀ» Ȱ¿ëÇÑ °æ¿ì ÇÏºÎ¿Í »óºÎ°£ ÄÜÅ©¸®Æ®ÀÇ ÀÏüȭ ¹× ¿ÂµµÂ÷¸¦ ³·Ãß°í, ¼öÈ­¿­ ÇÇÅ©½ÃÁ¡ÀÌ Èıâ·Î ´Ê¾îÁü¿¡ µû¶ó ±Õ¿­¹ß»ý°¡´É¼ºÀ» ÀúÇϽÃŰ´Â È¿°ú¸¦ È®ÀÎÇÒ ¼ö ÀÖ¾ú´Âµ¥, ƯÈ÷ 4´Ü Ÿ¼³¿¡¼­ °¡Àå ¾çÈ£ÇÑ È¿°ú°¡ ³ªÅ¸³²À» È®ÀÎÇÒ ¼ö ÀÖ¾ú´Ù.
Recently, the number of high-rise buildings being built in Korea by major construction companies for residential and commercial use has been increasing. When constructing a high-rise building, it is necessary to apply massive amounts of concrete to form a mat foundation that can withstand the huge load of the upper structure. However, it is of increasing concern that due to limitations in terms of the amount of placing equipment, available job-sites and systems for mass concrete placement in the construction field, it is not always possible to place a great quantity of concrete simultaneously in a large-scale mat foundation, and for this reason consistency between placement lift cannot be secured. In addition, a mat foundation Is likely to crack due to the stress caused by differences inhydration heat generation time. To derive a solution for these problems, this study provides test results of a hydration heat crack reduction method by applying placement lift change and setting time control with a super retarding agent for mass concrete in a large-scale mat foundation. Mock-up specimens with different mixtures and placement liftswere prepared at the job-site of a newly-constructed high-rise building. The test results show that slump flow of concrete before and after adding the super retarding agent somewhat Increases as the target retarding time gets longer, while the air content shows no great difference. The setting time was observed to be retarded as the target retarding time gets longer. As the target retarding time gets longer, compressive strength appears to be decreased at an early stage, but as time goes by, compressive strength gets higher, and the compressive strength at 28 days becomes equal or higher to that of plain concrete without a super retarding agent. For the effect of placement lift change and super retarding agent on the reduction of hydration heat, the application of 2 and 4 placement lifts and a super retarding agent makes it possible to secure consistency and reduce temperature difference between placement lifts, while also extending the time to reach peak temperature. This implies that the possibility of thermal crack induced by hydration heat is reduced. The best results are shown in the case of applying 4 placement lifts.
 
Ű¿öµå
¸ÅÆ®±âÃÊ;¸Å½º ÄÜÅ©¸®Æ®;ÃÊÁö¿¬Á¦;ÀÀ°á½Ã°£;Mat Foundation;Mass Concrete;Super Retarding Agent;Setting Time;
 
Çѱ¹°ÇÃà½Ã°øÇÐȸÁö / v.9, no.4, 2009³â, pp.55-61
Çѱ¹°ÇÃà½Ã°øÇÐȸ
ISSN : 1598-2033
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200931559903464)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿