¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹Áö¹Ý°øÇÐȸ / v.19, no.5, 2003³â, pp.109-122
±ÙÁ¢ÇÑ ¼öÁ÷±¸ °Ç¼³¿¡ µû¸¥ ±âÁ¸ ÅͳÎÀÇ ¿ªÇÐÀû °Åµ¿ ºÐ¼®
( Analysis of Mechanical Behavior of Existing Tunnel by the Construction of Shaft Nearby )
À̼®¿ø;Á¶¸¸¼·;À̼º¿ø; Çѱ¹°Ç¼³±â¼ú¿¬±¸¿ø Áö¹Ý¿¬±¸ºÎ;(ÁÖ)À¯´Ïº¤ Á¦1»ç¾÷º»ºÎ ÅÍ³ÎÆÀ;Çѱ¹°Ç¼³±â¼ú¿¬±¸¿ø Áö¹Ý¿¬±¸ºÎ;
 
ÃÊ ·Ï
±âÁ¸ öµµÅͳÎÀÇ ¿îÇà¼Óµµ Çâ»ó½Ã ¹®Á¦°¡ µÇ´Â Åͳγ» °ø±âÀÇ ¾ÐÃàÆÄ ¹®Á¦¸¦ ÇØ°áÇϱâ À§Çؼ­´Â ´Ü¸éÀÇ È­´ëº¸´Ù´Â Åëdz°ø ¼öÁ÷±¸ÀÇ °Ç¼³ÀÌ °æÁ¦¼º ¹× ½Ã°ø¼º Ãø¸é¿¡¼­ À¯¸®ÇÑ °ÍÀ¸·Î ¾Ë·ÁÁ® ÀÖ´Ù. º» ¿¬±¸¿¡¼­´Â Àå±âÀç·ÉÀÇ ¿î¿µÁßÀΠöµµÅͳο¡ Åëdz°ø ¼öÁ÷±¸¸¦ °Ç¼³ÇÔ¿¡ µû¶ó ¹ß»ýµÉ ¼ö ÀÖ´Â º»¼±ÅͳÎ, ÇϺΰ»µµ ±×¸®°í ¼öÁ÷±¸ÀÇ ¿ªÇÐÀû °Åµ¿µéÀ» ÆÄ¾ÇÇϱâ À§ÇÑ ¸ñÀûÀ¸·Î 3°³ÀÇ µ¶¸³ÀûÀÎ ¿ä¼Ò±â¼úµé¿¡ ´ëÇÏ¿© ½ÇÇèÀû, ÇØ¼®Àû ¿¬±¸¸¦ ¼öÇàÇÏ¿´´Ù. ¿¬±¸°á°ú, ¸ÕÀú Àå±âÀç·É°ú ÄÜÅ©¸®Æ® ¶óÀÌ´×ÀÇ °­µµ°ü°è´Â Àç·ÉÀÌ Áõ°¡ÇÔ¿¡ µû¶ó °­µµ°¡ ÀúÇÏÇÏ´Â °æÇâÀ» È®ÀÎÇÒ ¼ö ÀÖ¾úÀ¸¸ç, º»¼±Åͳΰú ¼öÁ÷±¸ÀÇ ÃÖ¼Ò ÀûÁ¤ÀÌ°Ý °Å¸®¸¦ ÇØ¼®ÀûÀ¸·Î ÃßÁ¤ÇÑ °á°ú´Â º»¼±ÅͳΠÁ÷°æ(D)ÀÇ ¾à 0.5D ÀÌ»óÀÌ ÀûÇÕÇÑ °ÍÀ¸·Î µµÃâµÇ¾ú´Ù. ´ÙÀ½À¸·Î ¼öÁ÷±¸ ±¼Âø¿¡ µû¸¥ ÇϺΰ»µµÀÇ 3Â÷¿øÀû °Åµ¿Àº ½ÃÇè½Ã°øÀÇ °èÃø°á°ú¿Í ź¼Ò¼º À¯ÇÑ¿ä¼ÒÇØ¼® °á°ú°¡ À¯»çÇÑ °æÇâÀ» ³ªÅ¸³»¾úÀ¸³ª, ¼öÁ÷±¸ ±¼Âø½Ã ¼öÁ÷±¸ ÀÚüÀÇ °Åµ¿ÆÄ¾ÇÀ» À§ÇÑ ºÐ¼®°á°ú¿¡¼­´Â ¼öÁ÷±¸ÀÇ ½Éµµº° Áö¹Ý°Åµ¿ °èÃø°á°ú¿Í 3Â÷¿ø À¯ÇÑ¿ä¼ÒÇØ¼® °á°ú°¡ »óÀÌÇÑ °Åµ¿À» º¸¿´´Ù. µû¶ó¼­ ÀÌ»óÀÇ ¿¬±¸°á°ú·ÎºÎÅÍ ¼öÆòÅͳο¡ ´ëÇÑ ÇØ¼®°á°ú¿Í °èÃø°á°úÀÇ °æÇâÀº À¯»çÇÏÁö¸¸ º¯À§, ÀÀ·Â µîÀÇ Á¤·®Àû ºñ±³¿¡¼­´Â Áö¹Ý¹°¼ºÄ¡ÀÇ ¼±Á¤¹æ¹ý¿¡ µû¶ó ´Ù¼Ò Å« Â÷À̰¡ ³ªÅ¸³²À» ¾Ë ¼ö ÀÖ¾ú´Ù. ¶ÇÇÑ ¼öÁ÷¹æÇâ¿¡ ´ëÇÑ °Åµ¿À» ÇØ¼®ÀûÀÎ ¹æ¹ýÀ¸·Î °ËÁõÇϱâ À§Çؼ­´Â ÁöÇ¥¸é¿¡¼­ÀÇ ¼öÆò¹æÇâ ÀÀ·Â, º¯À§¼ººÐÀ» Ç¥ÇöÇÒ ¼ö ÀÖ´Â ÀûÁ¤±â¹ý ¿¬±¸°¡ ¿ä±¸µÈ´Ù.
In order to release the pressure fluctuations and micro-pressure wave induced by the entering of train into the small cross sectional tunnel, it has been reported that the construction of air shaft has more advantages with respect to economy and constructability than the enlargement of cross section of existing tunnel. The field monitorings and analytical studies were conducted simultaneously in this study to analyze the mechanical behavior of existing railway tunnel, new cross tunnel and new shaft by the construction of new shaft nearby. The results showed that the minimum distance from existing tunnel to new shaft which secures the stability of existing tunnel was found to be half diameter of existing tunnel. On the three dimensional mechanical behavior of existing tunnel by the construction of new shaft, the results from the analytical study and field monitoring had a similar trend. The analytical study and field monitoring results, however, produced somewhat different results on the mechanical behavior of new shaft itself. These conclusions induce that the analytical method which has been applied on the analyses of horizontal tunnel could not be applied in the same way on the analysis of vertical shaft.
 
Ű¿öµå
Concrete lining;Railway tunnel;Shaft;TPMS;
 
Çѱ¹Áö¹Ý°øÇÐȸ³í¹®Áý / v.19, no.5, 2003³â, pp.109-122
Çѱ¹Áö¹Ý°øÇÐȸ
ISSN : 1229-2427
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200311921979120)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿