¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹Áö¹Ý°øÇÐȸ / v.27, no.6, 2011³â, pp.5-16
dzȭ¾Ï¼ÒÄÏ ´ë±¸°æ ÇöÀ埼³¸»¶ÒÀÇ ¼±´Üº¸°­±×¶ó¿ìÆÃ »ç·Ê
( A Case Study of Post-Grouted Drilled Shaft in Weathered Rock )
±Ç¿À¼º;Á¤¼º¹Î;ÃÖ¿ë±Ô; ´ë¸²»ê¾÷ ±â¼ú¿¬±¸¼Ò;(ÁÖ)ÁöÅØÅ©;°æ¼º´ëÇб³ °Ç¼³È¯°æ°øÇкÎ;
 
ÃÊ ·Ï
ÇöÀ埼³¸»¶ÒÀÇ Æ÷½ºÆ®±×¶ó¿ìÆÃ ±â¹ýÀº ¸»¶Ò ½Ã°ø½Ã ¹ß»ýÇÏ´Â ½½¶óÀÓ°ú ±¼ÂøÀ¸·Î ÀÎÇØ ±³¶õµÈ ¿øÁö¹ÝÀ» ¾ÐÃà ¹× º¸°­ÇÔÀ¸·Î½á ±âÃÊÀÇ ¼±´ÜÁöÁö·ÂÀ» ÇöÀúÈ÷ Áõ°­½ÃŰ´Â °ÍÀ¸·Î ¾Ë·ÁÁ® ÀÖ´Ù. ±×·¯³ª ÇöÀç±îÁö ±¹³»¿ÜÀûÀ¸·Î Åë¿ëµÇ´Â ¼³°èÁöħ ¶Ç´Â ½Ã¹æÀº ¾ø´Â »óÅÂÀ̸ç, ƯÈ÷ ±¹³»¿¡¼­´Â ¸»¶Ò Æ÷½ºÆ®±×¶ó¿ìÆÃ ±â¹ýÀÌ ¼³°èÁöÁö·Â Áõ°­ ¸ñÀûÀÌ ¾Æ´Ñ, ¼Ò¿äÁöÁö·Â¿¡ ¹Ì´ÞµÇ´Â ¸»¶Ò¿¡ ´ëÇÑ º¸¼öº¸°­ÀÇ °³³äÀ¸·Î ÀÌÇØµÇ°í ÀÖ¾î, ±× È¿°ú¿¡ ºñÇØ °ü·Ã ¿¬±¸ ¹× ½Ç¿ëÈ­ ½ÇÀûÀÌ ¹ÌºñÇÑ ½ÇÁ¤ÀÌ´Ù. º» ¿¬±¸¿¡¼­´Â Æ÷½ºÆ®±×¶ó¿ìÆÃ ±â¹ýÀÇ ±¹³» dzȭ´ë¼ÒÄÏ ÇöÀ埼³¸»¶Ò¿¡ÀÇ Àû¿ë¼ºÀ» °ËÁõÇϱâ À§ÇØ Ç³È­¾Ï ±ÙÀÔ ´ë±¸°æ ÇöÀ埼³ ÄÜÅ©¸®Æ®¸»¶Ò ½Ã°ø ÇöÀåÀ» ¼±Á¤ÇÏ¿© Æ÷½ºÆ®±×¶ó¿ìÆ® ½ÃÇè½Ã°øÀ» ½Ç½ÃÇÏ¿´´Ù. ¶ÇÇÑ Æ÷½ºÆ®±×¶ó¿ìÆÃ ¸»¶Ò, ±×¸®°í ÀÎÁ¢ÇÑ ¹Ìº¸°­ ¸»¶Ò¿¡ ´ëÇÑ Á¤ÀçÇϽÃÇèÀ» ¼öÇàÇÔÀ¸·Î½á, Æ÷½ºÆ®±×¶ó¿ìÆÃÀÌ ÇöÀ埼³¸»¶ÒÀÇ Ãà¹æÇâ ÁöÁö·Â Áõ°­¿¡ ¹ÌÄ¡´Â È¿°ú¸¦ Á¤·®ÀûÀ¸·Î ºñ±³ºÐ¼®ÇØ º¸°íÀÚ ÇÏ¿´´Ù. Á¤ÀçÇϽÃÇè °á°ú, ¼±´Üº¸°­ ¸»¶Ò ¼±´ÜÇÏÁß-ħÇϰÀÇ Ãʱâ±â¿ï±â°¡ ¹Ìº¸°­ ¸»¶Ò ¼±´ÜÈ÷Áß-ħÇϰÀÇ ±â¿ï±â¿¡ ºñÇØ 4¹è ÀÌ»ó Áõ°¡¿´À¸¸ç, Çã¿ëħÇÏ·®(1%D) ±âÁØÀ¸·Î º¸°­ ¹× ¹Ìº¸°­ ¸»¶ÒÀÇ ¼±´ÜÁöÁö·ÂÀº °¢°¢ 12.0MPa, 7.0MPa·Î ³ªÅ¸³ª, Æ÷½ºÆ®±×¶ó¿ìÆÃ Àû¿ë ÈÄ ¸»¶ÒÀÇ Çã¿ë¼±´ÜÁöÁö·ÂÀÌ 70% ÀÌ»ó Áõ°¡ÇÏ´Â °ÍÀ» È®ÀÎÇÏ¿´´Ù.
Post-grouting for the drilled shaft is known to remarkably increase the end bearing capacity of pile by consolidating and reinforcing the disturbed ground containing slime around the pile tip. However, the general design guideline for post-grouting has not been established yet in Korea. Especially in the domestic application, the post-grouting is employed just for repairing the pile with unacceptable resistance rather than for increasing the design resistance of pile. Therefore, little is reported about the effect of post-grouting on the pile resistance itself. In this study, the effect of post-grouting on the resistance of drilled shafts installed in the weathered rock in Korea was estimated by performing the bi-directional load tests on the piles with and without the post-grouting. The test results presented that the initial slope of end bearing-base displacement curve in the pile with post-grouting was 4 times higher than that without post-grouting. At the acceptable settlement (1% of pile diameter), the end bearing capacities of piles with and without the post-grouting were estimated to be 12.0 MPa and 7.0 MPa, respectively, which indicate that the post-grouting could increase the end bearing resistance of pile in weathered rock more than 70%.
 
Ű¿öµå
Drilled shaft;End bearing capacity;Post grouting;Tube-a-manchette;Weathered rock;
 
Çѱ¹Áö¹Ý°øÇÐȸ³í¹®Áý / v.27, no.6, 2011³â, pp.5-16
Çѱ¹Áö¹Ý°øÇÐȸ
ISSN : 1229-2427
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO201124359107333)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿