¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹µµ·ÎÇÐȸ / v.10, no.2, 2008³â, pp.193-203
½Å¼³ ÇÁ¸®Ä³½ºÆ® ÄÜÅ©¸®Æ® Æ÷Àå ½Ã°ø¹æ¹ý ¹× ¼³°èÁöħ °³¹ß
( Development of Construction Method and Design Guide for Newly Constructed Precast Concrete Pavements )
±è¼º¹Î;¹ÚÈñ¹ü;¾ç¼ºÃ¶;ÇѽÂȯ; °æÈñ´ëÇб³ Åä¸ñ°ÇÃà´ëÇÐ Åä¸ñ°øÇÐ;°æÈñ´ëÇб³ ´ëÇпø Åä¸ñ°øÇаú;È«ÀÍ´ëÇб³ °øÇдëÇÐ °ÇÃà°øÇаú;Çѱ¹µµ·Î°ø»ç µµ·Î±³Å뿬±¸¿ø;
 
ÃÊ ·Ï
º» ¿¬±¸´Â ÇÁ¸®Ä³½ºÆ® ÄÜÅ©¸®Æ® ½½·¡ºê¸¦ ÀÌ¿ëÇÑ ±Þ¼Ó ½Å¼³ µµ·Î Æ÷Àå °ø¹ýÀÇ ±¹³» Àû¿ë¼ºÀ» ºÐ¼®Çϱâ À§ÇÑ ±âÃÊ ¿¬±¸¸¦ ¼öÇàÇÏ°í ½ÃÇè½Ã°øÀ» ÅëÇØ ¼±¼³ ÇÁ¸®Ä³½ºÆ® Æ÷ÀåÀÇ ¼³°è ¹× ½Ã°ø ÁöħÀ» °³¹ßÇϱâ À§ÇÏ¿© ¼öÇàµÇ¾ú´Ù. ½ÃÇè½Ã°øÀ» À§ÇØ °¡·Î, ¼¼·Î, ±íÀ̰¡ °¢°¢ ½ÇÁ¦ Æ÷Àå ½½·¡ºêÀÇ 1/2 Å©±âÀÎ ½½·¡ºê¸¦ ¼³°èÇÏ¿© Á¦ÀÛÇÏ¿´À¸¸ç ÀÌ¿¡ ÀûÇÕÇÑ Ã¶±Ù¹è±Ù, Á¾¹æÇâ°ú Ⱦ¹æÇâÀÇ ¿¬°áºÎ, ±×¶ó¿ìÆÃ ¹æ¹ý µî¿¡ ´ëÇÏ¿© ºÐ¼®À» ¼öÇàÇÏ¿´´Ù. ÀÌ·¯ÇÑ ½½·¡ºê¸¦ ÀÌ¿ëÇÏ¿© Á¾¹æÇâ°ú Ⱦ¹æÇâÀ¸·Î µÎ °³¾¿ ÃÑ 4 °³ÀÇ ½½·¡ºê¸¦ ¿¬°áÇÏ¿© Æòź¼ºÀ» Á¶ÀýÇÑ ÈÄ Æ÷ÄÏ ºÎºÐ°ú ½½·¡ºê ÇϺÎÀÇ °ø°£À» ±×¶ó¿ìÆÃ ÇÔÀ¸·Î½á ½Ã°øÀ» ½Å¼Ó ¿ëÀÌÇÏ°Ô ¼öÇàÇÏ¿´´Ù. ½ÃÇè ½Ã°øÀ» ¼öÇàÇϸç ÇÁ¸®Ä³½ºÆ® Æ÷ÀåÀÇ ¼³°è ¹× ½Ã°ø°ú °ü·ÃµÈ ¼¼ºÎ »çÇ×À» ¸é¹ÐÈ÷ ºÐ¼®ÇÏ¿´À¸¸ç ÀÌ¿¡ ¹ÙÅÁÀ» µÎ¾î ÇÁ¸®Ä³½ºÆ® ½½·¡ºê¸¦ ÀÌ¿ëÇÏ¿© ±Þ¼ÓÇÏ°Ô ½Å¼³ µµ·Î¸¦ °Ç¼³ÇÒ ¶§ÀÇ ¼³°è ¹× ½Ã°ø ÁöħÀ» °³¹ßÇÏ¿´´Ù.
This study was conducted to investigate the feasibility of the expedite construction of new pavement systems using precast concrete slabs and to develop the design and construction guide based on the results of the experimental construction. Half scale concrete slabs were designed and fabricated and the optimal reinforcement design, linkages between the slabs in the longitudinal and transverse directions, and the grouting methods were investigated. The experimental construction was performed fast and easily by assembling two slabs in the longitudinal direction and the other two in the transverse direction. The slabs were leveled and the pockets and the space between the slab bottom and the underlying layer were grouted. From the experimental construction, details about the design and construction of the precast pavements were acquired. Finally, the design and construction guide for the newly constructed precast concrete pavement systems was developed.
 
Ű¿öµå
ÇÁ¸®Ä³½ºÆ®;ÄÜÅ©¸®Æ®;µµ·Î Æ÷Àå;½Ã°ø;±×¶ó¿ìÆÃ;Æòź¼º;¼³°èÁöħ;precast;concrete;pavement;construction;grouting;leveling;design guide;
 
Çѱ¹µµ·ÎÇÐȸ³í¹®Áý / v.10, no.2, 2008³â, pp.193-203
Çѱ¹µµ·ÎÇÐȸ
ISSN : 1738-7159
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200824556528999)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿