Çѱ¹µµ·ÎÇÐȸ / v.10, no.2, 2008³â, pp.193-203
|
½Å¼³ ÇÁ¸®Ä³½ºÆ® ÄÜÅ©¸®Æ® Æ÷Àå ½Ã°ø¹æ¹ý ¹× ¼³°èÁöħ °³¹ß
( Development of Construction Method and Design Guide for Newly Constructed Precast Concrete Pavements ) |
| ±è¼º¹Î;¹ÚÈñ¹ü;¾ç¼ºÃ¶;ÇѽÂȯ; °æÈñ´ëÇб³ Åä¸ñ°ÇÃà´ëÇÐ Åä¸ñ°øÇÐ;°æÈñ´ëÇб³ ´ëÇпø Åä¸ñ°øÇаú;È«ÀÍ´ëÇб³ °øÇдëÇÐ °ÇÃà°øÇаú;Çѱ¹µµ·Î°ø»ç µµ·Î±³Å뿬±¸¿ø;
|
|
|
 |
|
| |
| ÃÊ ·Ï |
| º» ¿¬±¸´Â ÇÁ¸®Ä³½ºÆ® ÄÜÅ©¸®Æ® ½½·¡ºê¸¦ ÀÌ¿ëÇÑ ±Þ¼Ó ½Å¼³ µµ·Î Æ÷Àå °ø¹ýÀÇ ±¹³» Àû¿ë¼ºÀ» ºÐ¼®Çϱâ À§ÇÑ ±âÃÊ ¿¬±¸¸¦ ¼öÇàÇÏ°í ½ÃÇè½Ã°øÀ» ÅëÇØ ¼±¼³ ÇÁ¸®Ä³½ºÆ® Æ÷ÀåÀÇ ¼³°è ¹× ½Ã°ø ÁöħÀ» °³¹ßÇϱâ À§ÇÏ¿© ¼öÇàµÇ¾ú´Ù. ½ÃÇè½Ã°øÀ» À§ÇØ °¡·Î, ¼¼·Î, ±íÀ̰¡ °¢°¢ ½ÇÁ¦ Æ÷Àå ½½·¡ºêÀÇ 1/2 Å©±âÀÎ ½½·¡ºê¸¦ ¼³°èÇÏ¿© Á¦ÀÛÇÏ¿´À¸¸ç ÀÌ¿¡ ÀûÇÕÇÑ Ã¶±Ù¹è±Ù, Á¾¹æÇâ°ú Ⱦ¹æÇâÀÇ ¿¬°áºÎ, ±×¶ó¿ìÆÃ ¹æ¹ý µî¿¡ ´ëÇÏ¿© ºÐ¼®À» ¼öÇàÇÏ¿´´Ù. ÀÌ·¯ÇÑ ½½·¡ºê¸¦ ÀÌ¿ëÇÏ¿© Á¾¹æÇâ°ú Ⱦ¹æÇâÀ¸·Î µÎ °³¾¿ ÃÑ 4 °³ÀÇ ½½·¡ºê¸¦ ¿¬°áÇÏ¿© Æòź¼ºÀ» Á¶ÀýÇÑ ÈÄ Æ÷ÄÏ ºÎºÐ°ú ½½·¡ºê ÇϺÎÀÇ °ø°£À» ±×¶ó¿ìÆÃ ÇÔÀ¸·Î½á ½Ã°øÀ» ½Å¼Ó ¿ëÀÌÇÏ°Ô ¼öÇàÇÏ¿´´Ù. ½ÃÇè ½Ã°øÀ» ¼öÇàÇϸç ÇÁ¸®Ä³½ºÆ® Æ÷ÀåÀÇ ¼³°è ¹× ½Ã°ø°ú °ü·ÃµÈ ¼¼ºÎ »çÇ×À» ¸é¹ÐÈ÷ ºÐ¼®ÇÏ¿´À¸¸ç ÀÌ¿¡ ¹ÙÅÁÀ» µÎ¾î ÇÁ¸®Ä³½ºÆ® ½½·¡ºê¸¦ ÀÌ¿ëÇÏ¿© ±Þ¼ÓÇÏ°Ô ½Å¼³ µµ·Î¸¦ °Ç¼³ÇÒ ¶§ÀÇ ¼³°è ¹× ½Ã°ø ÁöħÀ» °³¹ßÇÏ¿´´Ù. |
|
| This study was conducted to investigate the feasibility of the expedite construction of new pavement systems using precast concrete slabs and to develop the design and construction guide based on the results of the experimental construction. Half scale concrete slabs were designed and fabricated and the optimal reinforcement design, linkages between the slabs in the longitudinal and transverse directions, and the grouting methods were investigated. The experimental construction was performed fast and easily by assembling two slabs in the longitudinal direction and the other two in the transverse direction. The slabs were leveled and the pockets and the space between the slab bottom and the underlying layer were grouted. From the experimental construction, details about the design and construction of the precast pavements were acquired. Finally, the design and construction guide for the newly constructed precast concrete pavement systems was developed. |
| |
| Ű¿öµå |
| ÇÁ¸®Ä³½ºÆ®;ÄÜÅ©¸®Æ®;µµ·Î Æ÷Àå;½Ã°ø;±×¶ó¿ìÆÃ;Æòź¼º;¼³°èÁöħ;precast;concrete;pavement;construction;grouting;leveling;design guide; |
| |
|
|
 |
|