|
|
|
Çѱ¹¼öÀÚ¿øÇÐȸ / v.6, no.4, 2005³â, pp.179-187
|
( THE CHEONGGYE-CHEON ESTORATION PROJECT AND HYDROLOGICAL CYCLE ANALYSIS ) |
| ;;;; ;;;;
|
|
|
 |
|
| |
| ÃÊ ·Ï |
|
|
| This paper introduces the Cheonggye-cheon restoration project. The restoration project aims to revive the 600-year-old city of Seoul by recovering the historical heritage, guaranteeing safety from the deteriorated covering structures, creating the environment-friendly space, and revitalizing the neglected city centers. In order to understand the current hydrological cycle of the Chenggye-cheon watershed, the annual water balance of the region was calculated using the observed data including precipitation, runoff, water supply and sewage, and the changes in the groundwater level. The $2001{sim}2002$ data were used to calibrate the WEP, and the $2003{sim}2004$ data were used to verify the WEP. The calibration and validation results for the flood hydrograph how a reasonable value (at Majanggyo station, the R2 for the calibration period was 0.9, and that for the validation period was 0.7). According to the annual water balance of the Cheonggye-cheon watershed for 2004, the amount of surface runoff, infiltration, and evapotranspiration was 1,097mm, 216mm and 382mm, respectively, for an annual precipitation of 1,499mm. The application results from WEP, a distributed hydrological model, provide more detailed information of the watershed, and the model will be useful for improving the hydrological cycle in urban watershed. |
| |
| Ű¿öµå |
| Cheonggye-cheon restoration;hydrological cycle;WEP;distributed hydrologic model; |
| |
|
|
 |
|
Water Engineering Research / v.6, no.4, 2005³â, pp.179-187
Çѱ¹¼öÀÚ¿øÇÐȸ
ISSN : 1229-6503
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200506140780807)
¾ð¾î : ¿µ¾î |
|
| ³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø |
|
|
|
|
|
|