|
|
|
Çѱ¹¼öÀÚ¿øÇÐȸ / v.29, no.2, 1996³â, pp.209-219
|
¹æ·ù·® ¹× ÇÏ·ùºÎÀ¯È²À» °í·ÁÇÑ ÆÈ´ç´ïÀÇ ¼ö¹®Á¶ÀÛ±âÁØ ¼±Á¤
( Gate Operation Rule of Paldang Dam by Considering Discharge and Downstream Flow Pattern ) |
| ¼±Ô¿ì;ÀÌÁ¾¼³; ¿¬¼¼´ëÇб³ Åä¸ñ°øÇаú;¿¬¼¼´ëÇб³ Åä¸ñ°øÇаú ¹Ú»ç°úÁ¤, ¿¬¼¼´ëÇб³ Åä¸ñ°øÇаú Á¶±³¼ö, ¿¬¼¼´ëÇб³ Åä¸ñ°øÇаú;
|
|
|
 |
|
| |
| ÃÊ ·Ï |
| 1973³â ÆÈ´ç ¼ö·Â¹ßÀü¼Ò Áذø ÀÌ·¡·Î »ç¿ëÇÏ¿© ¿Â ¼ö¹®Á¶ÀÛ±âÁØÀº, 1985³â ÃæÁÖ ´Ù¸ñÀû´ï °Ç¼³¿¡ µû¸¥ ÇѰȫ¼ö¿¹°æº¸ ÇÁ·Î±×·¥ °³¼±¿¡ µû¶ó ÀϺΠ¼öÁ¤À» °ÅÃÄ »ç¿ëÇϰí ÀÖ´Ù. ±× µ¿¾È ÇѰ Á¾ÇÕ°³¹ß »ç¾÷ÀÇ ÇϵµÁ¤ºñ»ç¾÷°á°ú·Î ÆÈ´ç´ï ÇÏ·ùÁö¿ªÀÇ ¼ö¸éÀúÇϰ¡ °¡½ÃÀûÀ¸·Î ¹ß»ýÇÏ°Ô µÇ¾ú´Ù. ÀÌ·Î ÀÎÇØ ´ï °Ç¼³´ç½ÃÀÇ ³«Â÷¿¡ º¯È°¡ »ý°å°í ´ïÇÏ·ùºÎÀÇ ¼öÀ§°¡ Æò±Õ 3m Á¤µµ ÀúÇϵǾî Àá¼ö ¿À¸®Çǽº½Ä ¿©¼ö·ÎÀÎ ÆÈ´ç´ïÀÇ ¹æ·ù·® »êÁ¤½Ä¿¡ ¹®Á¦Á¡ÀÌ ¹ß»ýÇÏ¸é¼ ¼ö¹®°³¹æ¹æ½Äº° ¹æ·ù·®ÀÇ Àç»êÁ¤ÀÌ ºÒ°¡ÇÇÇØÁ³´Ù. º» ¿¬±¸¿¡¼´Â, ÀÌ·¯ÇÑ ¹®Á¦Á¡À» ÇØ°áÇÏ°í ¼ö¹®Á¶ÀÛ±âÁØÀ» °áÁ¤Çϱâ À§ÇÏ¿© ¼ö¸®¸ðÇü½ÇÇèÀ» ÅëÇØ ¼¼°¡Áö ¼ö¹®Á¶ÀÛ ¹æ½ÄÀ» ºñ±³, °ËÅäÇÏ¿´´Ù. ´ï¿ì¾È¿¡ À§Ä¡ÇÑ ¹ßÀü¼Ò ¼³ºñ ¹× ¿î¿µ¿¡ ¿µÇâÀ» ¹ÌÄ¡Áö ¾Ê´Â ¾ÈÀü¹üÀ§¸¦ ÃÖ¿ì¼±À¸·Î ÇÏ¿© ¹æ·ù·®º°, °³µµÇüź°·Î ÇÏ·ùºÎ¿¡¼ÀÇ À¯È²À» °üÂûÇÏ¿´À¸¸ç, ¶ÇÇÑ ¼öÄ¡¸ðÇüÀ¸·Îµµ ÇÏ·ùºÎÀ¯È²À» ¸ðÀÇÇÏ¿© °ËÅäÇÑ °á°ú, ÁÂÃø ¼ö¹® 5°³¾¿À» ¼øÂ÷ÀûÀ¸·Î °³¹æÇÏ´Â ¹æ½ÄÀ» °¡Àå ÀûÀýÇÑ ¼ö¹®Á¶ÀÛ±âÁØÀ¸·Î °áÁ¤ÇÏ¿´´Ù. |
|
| The existing gate operation rule of Paldang hydroelectric plant has been used since the construction of the dam in 1973 except partial modification due to the construction of Chungju multipurpose dam in 1985. The water level near the downstream of Paldang dam has been lowered about 3 m because of the channel maintenance of Han River development project. Thus, the discharge estimation formula based on the submerged orifice type spillway has to be re-evaluated by considering various patterns of the gate operation rules and lowered channel bed. In this study, three types of gate openings were tested to select the proper gate operation rules through the hydraulic model test for various discharges and opening heights. Also, the numerical analysis has been performed to simulate the flow patterns of downstream. As a result, the gate operation rule, which opens 5 gates each time from the left side, was selected as the proper gate operation rule of Paldang dam. |
| |
| Ű¿öµå |
|
| |
|
|
 |
|
Çѱ¹¼öÀÚ¿øÇÐȸÁö / v.29, no.2, 1996³â, pp.209-219
Çѱ¹¼öÀÚ¿øÇÐȸ
ISSN : 1738-9488
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO199611920097057)
¾ð¾î : Çѱ¹¾î |
|
| ³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø |
|
|
|
|
|
|