¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹°Ç¼³°ü¸®ÇÐȸ / v.9, no.5, 2008³â, pp.186-193
±¸Á¶¹° °â¿ë È븷ÀÌ ½ºÆ®·¯Æ® °ø¹ýÀÇ °³¼± ¿¬±¸
( A Study on the Technological Improvement of Strut as a Permanent Structure )
±è¼±±¹;È«¿ø±â; °æÈñ´ëÇб³ Åä¸ñ°ÇÃà´ëÇÐ, »êÇÐÇù·Â±â¼ú¿¬±¸¿ø;°æÈñ´ëÇб³ Åä¸ñ°ÇÃà´ëÇÐ, »êÇÐÇù·Â±â¼ú¿¬±¸¿ø;
 
ÃÊ ·Ï
È븷À̸¦ ÁöÁöÇÏ´Â ¹öÆÀ´ë¸¦ °¡¼³Àç°¡ ¾Æ´Ñ ÁÖ(ñ«)±¸Á¶Ã¼·Î ÀÌ¿ëÇÏ´Â SPS(Strut as a Permanent System) °ø¹ýÀÌ °³¹ßµÇ¾î ÃÖ±Ù ±¹³» °ø»çÇöÀå¿¡¼­ Ȱ¹ßÇÏ°Ô È°¿ëµÇ°í ÀÖ´Ù. ÀÌ °ø¹ýÀº °ÇÃà°ø»ç ÇöÀå¿¡¼­ ¿ø°¡Àý°¨, °ø±â´ÜÃà, ±¸Á¶Àû ¾ÈÁ¤¼º Çâ»ó, °Ç¼³È¯°æ °³¼± µî ´Ù¾çÇÑ ÀÌÁ¡À» ÁÖ´Â ¹Ý¸é ÁöÇÏÃþ°íÀÇ Áõ°¡¿Í ö°ñºÎÀ§ ³»È­ÇǺ¹À» Ãß°¡·Î ¼öÇàÇÏ¿©¾ß ÇÏ´Â ¹®Á¦Á¡ÀÌ ÀÖ´Ù. ÁöÇÏÃþ°íÀÇ Áõ°¡´Â È븷ÀÌ ±íÀÌ ¹× ÁöÇÏ ÃÖÀúºÎÀ§ ±¼Âø·® Áõ°¡ÀÇ ¹®Á¦Á¡À» À¯¹ßÇϰí, ³»È­ÇǺ¹ °ø»ç´Â °ø»çȯ°æÀ» ¿­¾ÇÇÏ°Ô ÇÔÀº ¹°·Ð °ø»çºñ Áõ´ëÀÇ ¿äÀÎÀÌ µÈ´Ù. µû¶ó¼­ º» ¿¬±¸´Â SPS °ø¹ýÀÇ ¹®Á¦Á¡À» °³¼±ÇÑ ¸ðµâÈ­µÈ ö°ñö±Ù º¹ÇÕ ±¸Á¶½Ã½ºÅÛ(modularized hybrid structure system)À» Á¦¾ÈÇÏ´Â °ÍÀ» ¸ñÀûÀ¸·Î ÇÑ´Ù. Á¦¾ÈµÈ °ø¹ýÀº ±¸¼º¿ø¸®¿Í ÇÔ²² ½ÇÇèÀ» ÅëÇÏ¿© ±¸Á¶Àû ¼º´ÉÀ» °ËÁõµÇ°í ´Ù¾çÇÑ °ø»çÁ¶°ÇÀ» ¸¸Á·½ÃŰ´Â ½Ã°ø¼º´ÉÀÌ ºÐ¼®µÈ´Ù.
The SPS, Strut as a Permanent System, method is widely adopted for the main structural member in addition to temporary strut function for the shuttering of excavation work. Although the SPS method has contributed to cost saving, time reduction, enhancement of structural stability, improvement of construction environment and so on at the building construction site, it caused the problems of increase of basement height and additional work for fire protection of steel structure. The increase of basement height caused the increase of shuttering depth and excavation, and the fire protection caused the additional cost as well as the deterioration of construction environment. In order to improve the problems, this paper is to propose a modularized hybrid structural system(HSD). The detail of the system is introduced and the structural performance and constructibility are proved through the experiment and site application.
 
Ű¿öµå
È븷ÀÌ;Åä°ø»ç;SPS °ø¹ý;SRC º¹ÇÕ±¸Á¶;MHS ½Ã½ºÅÛ;Soil Shuttering;Earth Work;SPS Method;SRC Structure;MHS System;
 
Çѱ¹°Ç¼³°ü¸®ÇÐȸ³í¹®Áý / v.9, no.5, 2008³â, pp.186-193
Çѱ¹°Ç¼³°ü¸®ÇÐȸ
ISSN : 2005-6095
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200835054211554)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿