¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹¼öÀÚ¿øÇÐȸ / v.36, no.3, 2003³â, pp.385-398
¼ÒÀ¯¿ª¿¡¼­ È«¼öÁ¶Àý¿ë ÆßÇÁ ¹× À¯¼öÁö ±Ô¸ðÀÇ °áÁ¤¿¡ °üÇÑ ¿¬±¸
( A Study on Determination of Capacity for Pump and Detention Pond in Small Basins for Flood Control )
¾ÈÅÂÁø;¹ÚÁ¾À±;·ùÈñÁ¤;±èÁßÈÆ; ÇѰæ´ëÇб³ Åä¸ñ°øÇаú;ÇàÁ¤ÀÚÄ¡ºÎ ¹æÀç±âÁØ´ã´ç°ü½Ç;ÇѰæ´ëÇб³ Åä¸ñ°øÇаú;°í·Á´ëÇб³ Åä¸ñȯ°æ°øÇаú;
 
ÃÊ ·Ï
³»¹è¼ö½Ã¼³°èȹ½Ã ÃÖ´ëÀú·ùºñ¿¡ ÀÇÇÑ À¯¼öÁö ±Ô¸ðÀÇ °áÁ¤ ¹æ¹ýÀº ÀÌÀü ¿¬±¸ÀÚ¿¡ ÀÇÇÏ¿© Á¦½ÃµÈ ¹Ù ÀÖ´Ù. º» ¿¬±¸¿¡¼­´Â µ¿µÎõ½Ã 11°³ ¼Ò±Ô¸ð ³»¹è¼ö½Ã¼³À» ¼±Á¤ÇÏ¿© ºÐ¼®ÇÑ °á°ú, ¹è¼ö¸éÀûÀÌ ÀÛ°í ÆßÇÁ±â´ÉÀÌ °­È­µÈ ³»¹è¼ö ½Ã¼³¿¡¼­´Â °­¿ìÁö¼Ó±â°£º° ¿ì¼öÁöÀÇ Àú·ùºñÀÇ Â÷ÀÌ´Â ¹Ì¹ÌÇϹǷΠÃÖ´ëÀú·ùºñ¿¡ ÀÇÇÑ Á¶Á¤Áö ±Ô¸ðÀÇ °áÁ¤Àº ¹«¸®°¡ ÀÖÀ½À» ¾Ë ¼ö ÀÖ¾ú´Ù. ¶ÇÇÑ ÃÖ´ëÀú·ùºñ¿¡ ÀÇÇÏ¿© °áÁ¤µÈ Á¶Á¤Áö ¿ë·®À» ÆßÇÁ¿¡ ÀÇÇÏ¿© ¹èÁ¦µÇ´Â ½Ã°£Àº ÆßÇÁÀÇ Çã¿ë½Ãµ¿°£°Ýº¸´Ù ªÀº °æ¿ìµµ ÀÖ¾î ÆßÇÁÀÇ ºó¹øÇÑ ÀÛµ¿À» ÃÊ·¡ÇÑ´Ù. ±×·¯¹Ç·Î Á¶Á¤Áö´Â ÆßÇÁÀÇ ºó¹øÇÑ ÀÛµ¿¿¡ ÀÇÇÑ ÆßÇÁ °íÀåÀÇ °¡´É¼ºÀ» ÇÇÇÒ ¼ö ÀÖ´Â ±Ô¸ð·Î °áÁ¤µÇ¾î¾ß ÇÑ´Ù. ´Ù¾çÇÑ ÆßÇÁ¿ë·®À» Àû¿ëÇÏ¿© ºÐ¼®ÇÑ °á°ú, ¼ÒÀ¯¿ª¿¡¼­µµ Á¶Á¤ÁöÀÇ ±â´ÉÀÌ °­È­µÈ ³»¼ö¹èÁ¦½Ã¼³¿¡¼­´Â ÃÖ´ëÀú·ùºñ¸¦ ±âÁØÀ¸·Î ÇÑ Á¶Á¤Áö ¿ë·®ÀÇ °áÁ¤Àº ÆßÇÁ¿î¿µ Ãø¸é¿¡¼­ Ÿ´çÇÔÀ» ¾Ë ¼ö ÀÖ¾ú´Ù. µû¶ó¼­ º» ¿¬±¸¿¡¼­´Â ¼Ò±Ô¸ð ¹è¼ö±¸¿ª¿¡¼­ Á¶Á¤Áö¿ë·®ÀÇ °áÁ¤½Ã ÆßÇÁÀÇ °èȹ¹è¼ö·®°ú À¯¼öÁöÀÇ ¿ë·®¿¡ µû¸¥ ÆßÇÁÀÇ ½Ãµ¿ºóµµ¸¦ ¹Ý¿µÇÏ¿© ±âÁ¸ÀÇ ÃÖ´ëÀú·ùºñ¿¡ ÀÇÇÑ ¹æ¹ýÀ» °³¼±ÇÑ ¹æ¾ÈÀ» Á¦½ÃÇÏ¿´´Ù. ¶ÇÇÑ À¯¼öÁö ±Ô¸ð¿Í ÆßÇÁ¿ë·®ÀÇ °ü°è¸¦ °£´ÜÇÑ ¼±Çü°èȹ¸ðÇüÀ¸·Î ºÐ¼®ÇÑ °á°ú, Á¾·¡ÀÇ À¯¼öÁö È«¼öÃßÀû¿¡ ÀÇÇÑ À¯¼öÁö ¿ë·® °áÁ¤Àº µµ½ÃÁö¿ªÀÇ ³»¹è¼ö½Ã¼³ °èȹ¿¡¸¸ Ÿ´çÇÔÀ» ¾Ë ¼ö ÀÖ¾ú´Ù.
The concept of the effective storage ratio has been suggested to determine the size of detention pond by the previous researchers. The 11 pump - pond facilities in Dongdu-chun city were selected to analyze the critical duration for design rainfall and the storage ratio for each rainfall duration in this study It has been then found that the criteria of the maximum storage ratio is not reasonable for determining the size of detention pond because the difference of storage ratio with respect to each rainfall duration is too small. Moreover, since the size of pond compared with the pump capacity is not always big enough, the pump should be frequently operated, which may result in pump failure. Thus, the pond should be sufficiently sized to prevent the possibility of the pump failure due to frequent operation. According to the analyses for changing pump capacity, it has been found that if the function of the pond compared with the pump is concentrated, determining the size of pond based on the storage ratio is operationally feasible for even small basin. Thus, an improved procedure based on the storage ratio for determining the size of detention pond in small basin has been suggested. The results by the proposed procedure considering pump switching frequency may lead to reasonable pump operation. A simple linear programming model has been also adopted to figure out the relationship between pump capacity and pond size. It has been shown that the determination lot the size of detention pond based on conventional hydrologic flood routing in pond is feasible for only urban districts not rural areas.
 
Ű¿öµå
ÆßÇÁ;Á¶Á¤Áö;ÃÖ´ëÀú·ùºñ;ÆßÇÁ ½Ãµ¿ºóµµ;pump;detention pond;critical duration;maximum storage ratio;pump switching frequency;
 
Çѱ¹¼öÀÚ¿øÇÐȸ³í¹®Áý / v.36, no.3, 2003³â, pp.385-398
Çѱ¹¼öÀÚ¿øÇÐȸ
ISSN : 1226-6280
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200302612607747)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿