¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹¼öÀÚ¿øÇÐȸ / v.30, no.5, 1997³â, pp.431-439
È«¼ö½Ã ½Ç½Ã°£ Àú¼öÁö ¿î¿µÀ» À§ÇÑ ÀÇ»ç°áÁ¤ Áö¿ø½Ã½ºÅÛ
( Decision Suport System for Real-Time Reservoir Operation during Flood Period )
½É¼øº¸;±è¼±±¸; ÃæºÏ´ëÇб³ °ø°ú´ëÇÐ Åä¸ñ°øÇаú;ÃæºÏ´ëÇб³ ´ëÇпø Åä¸ñ°øÇаú ¹Ú»ç°úÁ¤ ¼ö·á, Çѱ¹¼öÀÚ¿ø°ø»ç ¼öÀÚ¿ø¿¬±¸¼Ò, Çѱ¹¼öÀÚ¿ø°ø»ç ¼öÀÚ¿ø¿¬±¸¼Ò;
 
ÃÊ ·Ï
º» ¿¬±¸ÀÇ ¸ñÀûÀº ´Ù¸ñÀû Á¶¼öÁöÀÇ È«¼öÁ¶Àý´É·ÂÀ» ±Ø´ëÈ­Çϱâ À§ÇÑ È«¼ö½Ã ½Ç½Ã°£ Àú¼öÁö¿î¿µ ÀÇ»ç°áÁ¤ Áö¿ø ½Ã½ºÅÛÀ» °³¹ßÇÏ´Â °ÍÀÌ´Ù. º» ¿¬±¸¸¦ ÅëÇØ °³¹ßµÈ ÀÇ»ç°áÁ¤ Áö¿ø½Ã½ºÅÛÀº ¸ðµ¨º£À̽º¿Í ½Ç½Ã°£ ÀÚ·áó¸® ºÎ½Ã½ºÅÛ, »ç¿ëÀÚ ÀÎÅÍÆäÀ̽º·Î ±¸¼ºµÇ¾î ÀÖÀ¸¸ç, »ç¿ëÀÚ ÀÎÅÍÆäÀ̽º´Â ¸ðÇü¿¡ ÀÇÇØ ¿¹ÃøµÈ È«¼öÁ¶ÀýÁöÁ¡ÀÇ ¼ö¹®°î¼±°ú Àú¼öÁöÀÇ Àú¼öÀ§ ±×·¡ÇÁ¸£ ±×·¡ÇÈ ÇüÅ·Πº¸¿©ÁÙ ¼ö ÀÖµµ·Ï °³¹ßµÇ¾ú´Ù. °³¹ßµÈ ½Ã½ºÅÛÀÇ Àû¿ë¼ºÀ» °ËÁõÇϱâ À§ÇÏ¿© ±Ý°­À¯¿ªÀÇ 1987³â 7¿ù ¹× 1995³â 8¿ùÀÇ °ú°Å È«¼ö »ç»óÀ» °¡»ó ½Ç½Ã°£À¸·Î ´ëû´ï Àú¼öÁö ¿î¿µ¿¡ Àû¿ëÇÏ¿© ÀÇ»ç°áÁ¤°úÁ¤À» ¼öÇàÇϰí, ´ç½ÃÀÇ ¿î¿µ ½ÇÀû°ú ºñ±³¡¤°ËÅäÇÏ¿´´Ù. °³¹ßµÈ ½Ã½ºÅÛÀÇ ÀÇÇÑ Àú¼öÁö ¿î¿µÀº È«¼öÀ¯Ãâ¸ðÇü¿¡ ÀÇÇØ ¸ðÀǵǾúÀ¸¸ç, ±× °á°ú º» ½Ã½ºÅÛ¿¡ ÀÇÇÑ Àú¼öÁö¿î¿µÀº ±Ý°­ÇÏ·ùÀÇ È«¼öÁ¶Àý¿¡ ±â¿©ÇÒ ¼ö ÀÖ´Â °ÍÀ¸·Î ³ªÅ¸³µ´Ù.
This paper describes the development of a decision support system (DSS) for the real time reservoir operation that aims to maximize the flood control effect. In the decision support system, model base and real time data processing subsystem are included along with the graphical user interface(GUI) that is able to visualize the forecasted runoff hydrographs at the flood control points and reservoir water levels resulting from the model run as well as the current hydrologic status. The system was verified through the pseudo real time applications to the Taechong reservoir operation with the historical flood events of the Kum river basin occurred in July, 1987 and August, 1995, Decision making processes were performed using the developed system and the results were compared with the real operations at that time. The reservoir operation using the pseudo real time application of DSS were simulated by the flood runoff simulation model, that shows the reservoir operation by DSS were successful in flood control for the lower Kum River.
 
Ű¿öµå
 
Çѱ¹¼öÀÚ¿øÇÐȸ³í¹®Áý / v.30, no.5, 1997³â, pp.431-439
Çѱ¹¼öÀÚ¿øÇÐȸ
ISSN : 1226-6280
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO199711920100390)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿