¶óÆæÆ®¦¢Ä«Æä¦¢ºí·Î±×¦¢´õº¸±â
¾ÆÄ«µ¥¹Ì Ȩ ¸í»çƯ°­ ´ëÇבּ¸½Ç޹æ Á¶°æ½Ç¹« µ¿¿µ»ó°­ÀÇ Çѱ¹ÀÇ ÀüÅëÁ¤¿ø ÇÐȸº° ³í¹®
ÇÐȸº° ³í¹®

Çѱ¹°Ç¼³°ü¸®ÇÐȸ
Çѱ¹°ÇÃà½Ã°øÇÐȸ
Çѱ¹µµ·ÎÇÐȸ
Çѱ¹»ý¹°È¯°æÁ¶ÀýÇÐȸ
Çѱ¹»ýÅÂÇÐȸ
Çѱ¹¼öÀÚ¿øÇÐȸ
Çѱ¹½Ä¹°ÇÐȸ
Çѱ¹½Ç³»µðÀÚÀÎÇÐȸ
Çѱ¹ÀÚ¿ø½Ä¹°ÇÐȸ
Çѱ¹ÀܵðÇÐȸ
Çѱ¹Á¶°æÇÐȸ
Çѱ¹Áö¹Ý°øÇÐȸ
Çѱ¹ÇÏõȣ¼öÇÐȸ
Çѱ¹È¯°æ»ý¹°ÇÐȸ
Çѱ¹È¯°æ»ýÅÂÇÐȸ

Çѱ¹¼öÀÚ¿øÇÐȸ / v.39, no.2, 2006³â, pp.139-150
XP-SWMMÀ» ÀÌ¿ëÇÑ µµ½ÃÇÏõ¿¡¼­ÀÇ È«¼ö¼ÒÅë´É·Â Æò°¡
( Assessment of Flood Flow Conveyance for Urban Stream Using XP-SWMM )
È«Áعü;±èº´½Ä;¼­º´ÇÏ;±èÇü¼ö; Çѱ¹°Ç¼³±â¼ú¿¬±¸¿ø ¼öÀÚ¿ø¿¬±¸ºÎ;Çѱ¹°Ç¼³±â¼ú¿¬±¸¿ø ¼öÀÚ¿ø¿¬±¸ºÎ;ÀÎÇÏ´ëÇб³ Åä¸ñ°øÇаú;ÀÎÇÏ´ëÇб³ Åä¸ñ°øÇаú;
 
ÃÊ ·Ï
ÃÖ±Ù ±Þ¼ÓÇÑ µµ½ÃÈ­·Î ÀÎÇÑ À¯¿ª ³» ºÒÅõ¼ö ¸éÀûÀÇ Áõ°¡´Â ÀÚ¿¬À¯¿ª¿¡ ºñÇØ ªÀº µµ´Þ½Ã°£°ú ³ôÀº ÷µÎ È«¼ö·®À» À¯¹ßÇÏ¿© µµ½ÃÈ«¼ö ÇÇÇØÀÇ ¿øÀÎÀÌ µÇ°í ÀÖ´Ù. µû¶ó¼­ È«¼öÇÇÇØ¸¦ Àú°¨½Ã۰íÀÚ ±¸Á¶¹°Àû ¶Ç´Â ºñ±¸Á¶¹°Àû È«¼ö¹æ¾î ´ëÃ¥µéÀ» ¸¶·ÃÇÏ¿© ½ÃÇàÇϰí ÀÖ´Ù. º» ¿¬±¸ÀÇ ´ë»óÀ¯¿ªÀÎ ±¼Æ÷õ À¯¿ªÀº À¯¿ª ³»ÀÇ À¯Ãâ Æ¯¼ºÀÌ ¾Æ´Ñ ÇÏ·ùÀÇ ÇѰ­ ¿Ü¼öÀ§ Á¶°Ç¿¡ ÀÇÇØ ÀæÀº ħ¼ö ÇÇÇØ°¡ ¹ß»ýÇϰí ÀÖÀ¸¸ç, À̸¦ ¿¹¹æÇϰíÀÚ Æø 20mÀÇ Àӽà ¹æ¼ö·Î¸¦ Æø 80m·Î È®ÀåÇÒ ¿¹Á¤ÀÌ´Ù. ÀÌ¿¡ µû¶ó º» ¿¬±¸¿¡¼­´Â ´ëÇ¥ÀûÀÎ µµ½Ã À¯Ãâ ¸ðÇüÀÇ ÇϳªÀÎ EPAÀÇ SWMM ¸ðÇüÀ» ±Ù°£À¸·Î ÇÏ´Â XP-SWMM¸ðÇüÀ» ÀÌ¿ëÇØ ±¼Æ÷õ ¹æ¼ö·Î È®Àå¿¡ µû¸¥ È«¼ö¼ÒÅë´É·ÂÀ» ºÐ¼®ÇÏ¿´´Ù. ÀçÇö±â°£ 100³âÀÎ ¼³°è °­¿ì¿Í µ¿ÀÏÇÑ Á¶À§ Á¶°Ç ÇÏ¿¡¼­ °³¼öÀü°ú ÈÄ¿¡ ´ëÇÑ ¼öÀ§¿Í À¯·®À» ºñ±³ÇÏ¿´À¸¸ç, ºÐ¼®°á°ú °³¼öÀü »óȲÀÌ °³¼öÈÄ¿¡ ºñÇØ Åë°ú À¯·®ÀÌ 1/3ÀÓ¿¡µµ ºÒ±¸ÇÏ°í ºñ½ÁÇϰųª ´õ ³ôÀº ¼öÀ§¸¦ ³ªÅ¸³»¾ú´Ù. ¶ÇÇÑ °³¼öÈÄ »óÅ¿¡¼­ ¸ðÀÇÇÑ °á°ú ¹æ¼ö·Î ºÐ±âÁ¡¿¡¼­ ÀÚ¿¬ ºÐ·ù½Ãų °æ¿ì ÃÖ°í $300m^3/sec$ °¡±î¿î À¯·®ÀÌ ¹æ¼ö·Î ¹æÇâÀ¸·Î ¿ª·ùÇÔÀ» È®ÀÎÇÒ ¼ö ÀÖ¾ú´Ù. µû¶ó¼­ ¹æ¼ö·ÎÀÇ ¾ÈÁ¤Àû ¿î¿µÀ» À§Çؼ­´Â ±¼Æ÷õ ÇÏ·ù·ÎºÎÅÍ ¹æ¼ö·Î·ÎÀÇ ¿ª·ù¸¦ Â÷´ÜÇϱâ À§ÇÑ ¼ö¸® ½Ã¼³¹°ÀÇ ¼³Ä¡°¡ ÇÊ¿äÇÔÀ» È®ÀÎÇÒ ¼ö ÀÖ¾ú´Ù.
In recent, increasing of the impervious area gives rise to short concentration time and high peak discharge comparing with natural watershed and it is a cause of urban flood damage. Therefore, we have performed for structural and non-structural plans to reduce the damage from inundation. The Gulpo-cheon basin had been frequently inundated and damaged due to the water level of Han river. So, the Gulpo-cheon floodway was constructed with 20 meters width for flood control in the basin but it was not enough for our expectation and now we have a plan to expand the floodway to 80 meters. We use a XP-SWMM model developed based on EPA-SWMM version for analyzing the capacity of flood conveyance by the expansion of Gulpo-cheon floodway with the same 100 years return period design storm and the same tidal conditions of the Yellow sea. The flood conveyance after the expansion of floodway becomes three times comparing it with before the expansion. Also we simulate the flood discharge at the diversion point of Gulpo-cheon for the expanded condition of floodway and know that the discharge of about 300 m3/sec is flowing backward to the expanded floodway. Therefore we may need some kinds of hydraulic structures to prevent the back water.
 
Ű¿öµå
±¼Æ÷õ ¹æ¼ö·Î;È«¼ö¼ÒÅë´É·Â;µµ½ÃÀ¯Ãâ¸ðÇü;Gulpo-cheon floodway;flood flow conveyance;urban rainfall-runoff model;XP-SWMM;
 
Çѱ¹¼öÀÚ¿øÇÐȸ³í¹®Áý / v.39, no.2, 2006³â, pp.139-150
Çѱ¹¼öÀÚ¿øÇÐȸ
ISSN : 1226-6280
UCI : G100:I100-KOI(KISTI1.1003/JNL.JAKO200614222989896)
¾ð¾î : Çѱ¹¾î
³í¹® Á¦°ø : KISTI Çѱ¹°úÇбâ¼úÁ¤º¸¿¬±¸¿ø
¸ñ·Ïº¸±â
ȸ»ç¼Ò°³ ±¤°í¾È³» ÀÌ¿ë¾à°ü °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ Ã¥ÀÓÀÇ ÇѰè¿Í ¹ýÀû°íÁö À̸ÞÀÏÁÖ¼Ò ¹«´Ü¼öÁý °ÅºÎ °í°´¼¾ÅÍ
   

ÇÏÀ§¹è³ÊÀ̵¿